The first four boards went to JLC
The Base, C4, B8 and A7 are at the fab, two of each. Here's what's coming back, and what happens when it does.
On 21 October the first fab run went in: two each of the Base and three cards.
- The Base, the board everything else plugs into.
- C4, precision measurement: thermocouples, RTDs, bridges and load cells.
- B8, a current profiler, from sleep current to radio bursts.
- A7, field I/O: ±10 V, 4–20 mA, relays and counters.

These are renders of the exact files JLC is building. When the boards arrive, photos replace them, and the build log picks up with bring-up: power first, then each card on the Base.